P

Pennstar Solar in Philadelphia

Philadelphia, Pennsylvania·Solar Installation
Residential

6+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Pennstar Solar

Southeastern Pennsylvania solar and storage installer with transparent pricing and competitive timelines

Philadelphia, Pennsylvania 19066

Philadelphia, Pennsylvania 19066

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECCanadian Solar

Inverters

EnphaseSolarEdge

Batteries

EnphaseTesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Philadelphia, PennsylvaniaMerion Station, PennsylvaniaArdmore, PennsylvaniaBryn Mawr, PennsylvaniaKing of Prussia, PennsylvaniaNorristown, Pennsylvania

Customer Reviews

No reviews yet. Be the first to review Pennstar Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Pennstar Solar?

You can request a quote through the form on this page or contact Pennstar Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Pennstar Solar serve?

Pennstar Solar is based in Philadelphia and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Pennstar Solar hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Pennstar Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Pennstar Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Pennstar Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Pennstar Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Pennstar Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2020
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Pennstar Solar

Send your project details to request follow-up from Pennstar Solar. Response timing and consultation terms are set by the company.

For Pennstar Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

Pennstar Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.