PCI Renewables in Spokane
17+ yrs
Experience
100 km
Service radius
11-50
Employees
Profile information
About PCI Renewables
Design-build electrical and renewable energy contractor in Spokane Valley since 2009
Spokane, Washington 99212
Spokane, Washington 99212
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review PCI Renewables!
Frequently Asked Questions
How do I get a quote from PCI Renewables?
You can request a quote through the form on this page or contact PCI Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does PCI Renewables serve?
PCI Renewables is based in Spokane and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does PCI Renewables hold?
This profile does not list independently verified certifications. Ask PCI Renewables for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does PCI Renewables offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask PCI Renewables for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask PCI Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does PCI Renewables handle permits and paperwork?
The exact scope is not verified on this profile. Ask PCI Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from PCI Renewables
Send your project details to request follow-up from PCI Renewables. Response timing and consultation terms are set by the company.
For PCI Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
PCI Renewables