Paff Electric & Solar in Cincinnati
40+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Paff Electric & Solar
Woman-owned electrical and solar company serving Cincinnati for 40+ years
Cincinnati, Ohio 45238
Cincinnati, Ohio 45238
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Paff Electric & Solar!
Frequently Asked Questions
How do I get a quote from Paff Electric & Solar?
You can request a quote through the form on this page or contact Paff Electric & Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Paff Electric & Solar serve?
Paff Electric & Solar is based in Cincinnati and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Paff Electric & Solar hold?
This profile lists the following reported certifications: BBB Accredited, Women's Business Enterprise (WBE), Small Business Enterprise (SBE), EVITP Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Paff Electric & Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Paff Electric & Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Paff Electric & Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Paff Electric & Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Paff Electric & Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Paff Electric & Solar
Send your project details to request follow-up from Paff Electric & Solar. Response timing and consultation terms are set by the company.
For Paff Electric & Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Paff Electric & Solar