O

OneGrid in Providence

Providence, Rhode Island·Solar Installation
ResidentialCommercial

14+ yrs

Experience

1000+

Projects

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About OneGrid

Providence-based Elite solar and battery installer with 12 years of experience and a lifetime warranty

Providence, Rhode Island 02903

Providence, Rhode Island 02903

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditMaintenanceMonitoringGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPEnergySage Elite InstallerBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

QcellsREC

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Providence, Rhode IslandCranston, Rhode IslandWarwick, Rhode IslandPawtucket, Rhode IslandEast Providence, Rhode IslandWoonsocket, Rhode IslandNewport, Rhode IslandBristol, Rhode Island

Customer Reviews

No reviews yet. Be the first to review OneGrid!

Write a Review

Frequently Asked Questions

How do I get a quote from OneGrid?

You can request a quote through the form on this page or contact OneGrid directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does OneGrid serve?

OneGrid is based in Providence and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does OneGrid hold?

This profile lists the following reported certifications: NABCEP, EnergySage Elite Installer, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does OneGrid offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask OneGrid for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask OneGrid for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does OneGrid handle permits and paperwork?

The exact scope is not verified on this profile. Ask OneGrid which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2012
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from OneGrid

Send your project details to request follow-up from OneGrid. Response timing and consultation terms are set by the company.

For OneGrid

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.