O

Old Coast Heating & Air Conditioning in Savannah

Savannah, Georgia·Solar Installation
Residential

14+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Old Coast Heating & Air Conditioning

BBB accredited Savannah HVAC and solar company providing residential solar installation, battery storage, and generator systems since 2012

Savannah, Georgia 31401

Savannah, Georgia 31401

Services Offered

Solar InstallationSolar DesignBattery StorageMaintenanceEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedENERGY STAR Certified

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Savannah, GeorgiaPooler, GeorgiaRichmond Hill, GeorgiaHinesville, GeorgiaTybee Island, GeorgiaGarden City, Georgia

Customer Reviews

No reviews yet. Be the first to review Old Coast Heating & Air Conditioning!

Write a Review

Frequently Asked Questions

How do I get a quote from Old Coast Heating & Air Conditioning?

You can request a quote through the form on this page or contact Old Coast Heating & Air Conditioning directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Old Coast Heating & Air Conditioning serve?

Old Coast Heating & Air Conditioning is based in Savannah and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Old Coast Heating & Air Conditioning hold?

This profile lists the following reported certifications: BBB Accredited, ENERGY STAR Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Old Coast Heating & Air Conditioning offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Old Coast Heating & Air Conditioning for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Old Coast Heating & Air Conditioning for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Old Coast Heating & Air Conditioning handle permits and paperwork?

The exact scope is not verified on this profile. Ask Old Coast Heating & Air Conditioning which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2012
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Old Coast Heating & Air Conditioning

Send your project details to request follow-up from Old Coast Heating & Air Conditioning. Response timing and consultation terms are set by the company.

For Old Coast Heating & Air Conditioning

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
O

Old Coast Heating & Air Conditioning

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.