O

Occidental Power in San Francisco

San Francisco, California·Solar Installation
ResidentialCommercial

37+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Occidental Power

San Francisco's first solar electric company, providing solar and energy storage since 1989

San Francisco, California 94112

San Francisco, California 94112

Services Offered

Solar InstallationBattery StorageMaintenancesolar_water_heating

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedCSLB Licensed

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Solaria

Inverters

SolarEdgeSMA

Batteries

Tesla PowerwallSonnen

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

San Francisco, CaliforniaDaly City, CaliforniaSouth San Francisco, CaliforniaPacifica, CaliforniaSan Bruno, CaliforniaSan Mateo, California

Customer Reviews

No reviews yet. Be the first to review Occidental Power!

Write a Review

Frequently Asked Questions

How do I get a quote from Occidental Power?

You can request a quote through the form on this page or contact Occidental Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Occidental Power serve?

Occidental Power is based in San Francisco and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Occidental Power hold?

This profile lists the following reported certifications: BBB Accredited, CSLB Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Occidental Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Occidental Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Occidental Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Occidental Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask Occidental Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1989
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Occidental Power

Send your project details to request follow-up from Occidental Power. Response timing and consultation terms are set by the company.

For Occidental Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
O

Occidental Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.