N

NuWatt Energy in Boston

Boston, Massachusetts·Solar Installation
ResidentialCommercial

18+ yrs

Experience

2500+

Projects

100 km

Service radius

51-100

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About NuWatt Energy

Solar, battery storage, and smart home technology across nine states since 2008

Boston, Massachusetts 01801

Boston, Massachusetts 01801

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Boston, MassachusettsWoburn, MassachusettsCambridge, MassachusettsLowell, MassachusettsWorcester, MassachusettsSpringfield, Massachusetts

Customer Reviews

No reviews yet. Be the first to review NuWatt Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from NuWatt Energy?

You can request a quote through the form on this page or contact NuWatt Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does NuWatt Energy serve?

NuWatt Energy is based in Boston and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does NuWatt Energy hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does NuWatt Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask NuWatt Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask NuWatt Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does NuWatt Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask NuWatt Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees51-100
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from NuWatt Energy

Send your project details to request follow-up from NuWatt Energy. Response timing and consultation terms are set by the company.

For NuWatt Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

NuWatt Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.