N

NRG Clean Power in Los Angeles

Los Angeles, California·Solar Installation
ResidentialCommercial

39+ yrs

Experience

100 km

Service radius

51-200

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About NRG Clean Power

Diamond-certified solar installer serving Los Angeles with NABCEP-accredited professionals and a 40-year workmanship warranty

Los Angeles, California 91303

Los Angeles, California 91303

Services Offered

Solar InstallationBattery StorageMonitoringSolar DesignEnergy AuditRoof Assessment

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB AccreditedTesla CertifiedEnphase GoldREC CertifiedSEIA Member

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

REC

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphaseFranklinAnkerSolarEdge

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

40yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Los Angeles, CaliforniaCanoga Park, CaliforniaSan Fernando Valley, CaliforniaSanta Clarita, CaliforniaPasadena, CaliforniaLong Beach, CaliforniaThousand Oaks, CaliforniaSan Diego, CaliforniaSacramento, CaliforniaSan Jose, California

Customer Reviews

No reviews yet. Be the first to review NRG Clean Power!

Write a Review

Frequently Asked Questions

How do I get a quote from NRG Clean Power?

You can request a quote through the form on this page or contact NRG Clean Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does NRG Clean Power serve?

NRG Clean Power is based in Los Angeles and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does NRG Clean Power hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited, Tesla Certified, Enphase Gold, REC Certified, SEIA Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does NRG Clean Power offer?

This profile reports 25-year panel coverage and 40-year workmanship coverage. Ask NRG Clean Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask NRG Clean Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does NRG Clean Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask NRG Clean Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded1987
Employees51-200
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from NRG Clean Power

Send your project details to request follow-up from NRG Clean Power. Response timing and consultation terms are set by the company.

For NRG Clean Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

NRG Clean Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.