N

Northwest Electric & Solar in Seattle

Seattle, Washington·Solar Installation
ResidentialCommercial

15+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Northwest Electric & Solar

Published directory profile for Northwest Electric & Solar in Seattle. Verify services, credentials, ratings, and references directly with their original sources.

Seattle, Washington 98028

Seattle, Washington 98028

Services Offered

Solar InstallationBattery StorageEV Chargingelectrical_services

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedTesla Premier Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Tesla

Inverters

TeslaEnphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Seattle, WashingtonBellevue, WashingtonKirkland, WashingtonRedmond, WashingtonBothell, WashingtonKenmore, WashingtonShoreline, Washington

Customer Reviews

No reviews yet. Be the first to review Northwest Electric & Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Northwest Electric & Solar?

You can request a quote through the form on this page or contact Northwest Electric & Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Northwest Electric & Solar serve?

Northwest Electric & Solar is based in Seattle and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Northwest Electric & Solar hold?

This profile lists the following reported certifications: BBB Accredited, Tesla Premier Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Northwest Electric & Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Northwest Electric & Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Northwest Electric & Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Northwest Electric & Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Northwest Electric & Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2011
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Northwest Electric & Solar

Send your project details to request follow-up from Northwest Electric & Solar. Response timing and consultation terms are set by the company.

For Northwest Electric & Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

Northwest Electric & Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.