N

North Coast Solar in Detroit

Detroit, Michigan·Solar Installation
ResidentialCommercial

6+ yrs

Experience

500+

Projects

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About North Coast Solar

Michigan's only certified Solar Insure and Pearl Certification installer with statewide coverage

Detroit, Michigan 48423

Detroit, Michigan 48423

Services Offered

Solar InstallationBattery StorageSolar DesignMonitoringMaintenanceRoof Assessmentelectrical_servicesgenerators

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Solar Insure CertifiedPearl CertificationBBB A+ Rating

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

30yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Detroit, MichiganDavison, MichiganFlint, MichiganGrand Rapids, MichiganWarren, MichiganSterling Heights, MichiganLansing, MichiganAnn Arbor, MichiganTroy, MichiganSaginaw, Michigan

Customer Reviews

No reviews yet. Be the first to review North Coast Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from North Coast Solar?

You can request a quote through the form on this page or contact North Coast Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does North Coast Solar serve?

North Coast Solar is based in Detroit and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does North Coast Solar hold?

This profile lists the following reported certifications: Solar Insure Certified, Pearl Certification, BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does North Coast Solar offer?

This profile reports 25-year panel coverage and 30-year workmanship coverage. Ask North Coast Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask North Coast Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does North Coast Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask North Coast Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from North Coast Solar

Send your project details to request follow-up from North Coast Solar. Response timing and consultation terms are set by the company.

For North Coast Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

North Coast Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.