N

NOLA Solar Power in New Orleans

New Orleans, Louisiana·Solar Installation
ResidentialOff-Grid

12+ yrs

Experience

80 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About NOLA Solar Power

Locally owned New Orleans solar company providing grid-tied and off-grid solar solutions for over 10 years

New Orleans, Louisiana 70118

New Orleans, Louisiana 70118

Services Offered

Solar InstallationSolar DesignMaintenance

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

New Orleans, LouisianaMetairie, LouisianaKenner, LouisianaGretna, LouisianaAlgiers, LouisianaGentilly, LouisianaLakeview, Louisiana

Customer Reviews

No reviews yet. Be the first to review NOLA Solar Power!

Write a Review

Frequently Asked Questions

How do I get a quote from NOLA Solar Power?

You can request a quote through the form on this page or contact NOLA Solar Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does NOLA Solar Power serve?

NOLA Solar Power is based in New Orleans and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does NOLA Solar Power hold?

This profile does not list independently verified certifications. Ask NOLA Solar Power for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does NOLA Solar Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask NOLA Solar Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask NOLA Solar Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does NOLA Solar Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask NOLA Solar Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2014
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from NOLA Solar Power

Send your project details to request follow-up from NOLA Solar Power. Response timing and consultation terms are set by the company.

For NOLA Solar Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

NOLA Solar Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.