N

New Energy Solutions in Omaha

Omaha, Nebraska·Solar Installation
Residential
0

60 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About New Energy Solutions

Omaha solar and roofing company offering energy-saving upgrades and solar panel installation

Omaha, Nebraska 68108

Omaha, Nebraska 68108

Services Offered

Solar Installation

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Listed

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Omaha, NebraskaBellevue, NebraskaLa Vista, NebraskaPapillion, NebraskaCouncil Bluffs, Nebraska

Customer Reviews

No reviews yet. Be the first to review New Energy Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from New Energy Solutions?

You can request a quote through the form on this page or contact New Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does New Energy Solutions serve?

New Energy Solutions is based in Omaha and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does New Energy Solutions hold?

This profile lists the following reported certifications: BBB Listed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does New Energy Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask New Energy Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask New Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does New Energy Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask New Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

0
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from New Energy Solutions

Send your project details to request follow-up from New Energy Solutions. Response timing and consultation terms are set by the company.

For New Energy Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

New Energy Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.