N

Neil Kelly Solar in Portland

Portland, Oregon·Solar Installation
ResidentialCommercial

13+ yrs

Experience

80 km

Service radius

51-100

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Neil Kelly Solar

Division of Portland's iconic Neil Kelly Company, offering solar since 2013 with B Corp certification

Portland, Oregon 97217

Portland, Oregon 97217

Services Offered

Solar InstallationBattery Storagesystem_design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

B CorporationBBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Portland, OregonBeaverton, OregonLake Oswego, OregonTigard, OregonHillsboro, Oregon

Customer Reviews

No reviews yet. Be the first to review Neil Kelly Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Neil Kelly Solar?

You can request a quote through the form on this page or contact Neil Kelly Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Neil Kelly Solar serve?

Neil Kelly Solar is based in Portland and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Neil Kelly Solar hold?

This profile lists the following reported certifications: B Corporation, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Neil Kelly Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Neil Kelly Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Neil Kelly Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Neil Kelly Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Neil Kelly Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2013
Employees51-100
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Neil Kelly Solar

Send your project details to request follow-up from Neil Kelly Solar. Response timing and consultation terms are set by the company.

For Neil Kelly Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

Neil Kelly Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.