N

NCI Solar Group in Richmond

Richmond, Virginia·Solar Installation
CommercialIndustrial

32+ yrs

Experience

250 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About NCI Solar Group

Richmond-headquartered solar developer and EPC contractor with 30 years of construction experience and NABCEP-certified professionals

Richmond, Virginia 23237

Richmond, Virginia 23237

Services Offered

Solar InstallationSolar DesignEnergy AuditMaintenanceGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Richmond, VirginiaChantilly, VirginiaHampton, VirginiaNorfolk, VirginiaVirginia Beach, Virginia

Customer Reviews

No reviews yet. Be the first to review NCI Solar Group!

Write a Review

Frequently Asked Questions

How do I get a quote from NCI Solar Group?

You can request a quote through the form on this page or contact NCI Solar Group directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does NCI Solar Group serve?

NCI Solar Group is based in Richmond and serves within a 250 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does NCI Solar Group hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does NCI Solar Group offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask NCI Solar Group for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask NCI Solar Group for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does NCI Solar Group handle permits and paperwork?

The exact scope is not verified on this profile. Ask NCI Solar Group which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1994
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from NCI Solar Group

Send your project details to request follow-up from NCI Solar Group. Response timing and consultation terms are set by the company.

For NCI Solar Group

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

NCI Solar Group

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.