N

NC Solar Now in Durham

Durham, North Carolina·Solar Installation
ResidentialCommercial

17+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About NC Solar Now

North Carolina's trusted solar installer since 2009 — NABCEP certified with expertise in all major brands

Durham, North Carolina 27604

Durham, North Carolina 27604

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedNC General Contracting LicenseNC Electrical Contractors LicenseVA AES Electrical License

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

QcellsRECSilfabJinko

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ BatteryFranklinFortress Power

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Durham, North CarolinaRaleigh, North CarolinaCary, North CarolinaChapel Hill, North CarolinaWake Forest, North Carolina

Customer Reviews

No reviews yet. Be the first to review NC Solar Now!

Write a Review

Frequently Asked Questions

How do I get a quote from NC Solar Now?

You can request a quote through the form on this page or contact NC Solar Now directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does NC Solar Now serve?

NC Solar Now is based in Durham and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does NC Solar Now hold?

This profile lists the following reported certifications: NABCEP Certified, NC General Contracting License, NC Electrical Contractors License, VA AES Electrical License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does NC Solar Now offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask NC Solar Now for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask NC Solar Now for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does NC Solar Now handle permits and paperwork?

The exact scope is not verified on this profile. Ask NC Solar Now which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from NC Solar Now

Send your project details to request follow-up from NC Solar Now. Response timing and consultation terms are set by the company.

For NC Solar Now

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

NC Solar Now

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.