N

NATiVE Solar in Austin

Austin, Texas·Solar Installation
ResidentialCommercial

19+ yrs

Experience

1000+

Projects

160 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About NATiVE Solar

One of the longest-running Texas-owned solar installers with over 1,000 projects and 60 MW installed statewide

Austin, Texas 78702

Austin, Texas 78702

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditMaintenanceMonitoringGrid ConnectionCommercial Solar

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB AccreditedAmicus Solar Cooperative Member

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Mission SolarRECQcells

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Austin, TexasSan Antonio, TexasDallas, TexasDripping Springs, TexasRound Rock, TexasCedar Park, TexasGeorgetown, TexasKyle, TexasNew Braunfels, Texas

Customer Reviews

No reviews yet. Be the first to review NATiVE Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from NATiVE Solar?

You can request a quote through the form on this page or contact NATiVE Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does NATiVE Solar serve?

NATiVE Solar is based in Austin and serves within a 160 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does NATiVE Solar hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited, Amicus Solar Cooperative Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does NATiVE Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask NATiVE Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask NATiVE Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does NATiVE Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask NATiVE Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from NATiVE Solar

Send your project details to request follow-up from NATiVE Solar. Response timing and consultation terms are set by the company.

For NATiVE Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

NATiVE Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.