N

Namaste Solar in Fort Collins

Fort Collins, Colorado·Solar Installation
ResidentialCommercial

21+ yrs

Experience

9600+

Projects

200 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Namaste Solar

Employee-owned B Corporation with 9,600+ home solar installations across Colorado since 2005

Fort Collins, Colorado 80524

Fort Collins, Colorado 80524

Services Offered

Solar InstallationBattery StorageEV ChargingSolar DesignEnergy AuditGrid ConnectionMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPB CorporationColorado Contractor License

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Fort Collins, ColoradoBoulder, ColoradoDenver, ColoradoLongmont, ColoradoLoveland, ColoradoGreeley, Colorado

Customer Reviews

No reviews yet. Be the first to review Namaste Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Namaste Solar?

You can request a quote through the form on this page or contact Namaste Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Namaste Solar serve?

Namaste Solar is based in Fort Collins and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Namaste Solar hold?

This profile lists the following reported certifications: NABCEP, B Corporation, Colorado Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Namaste Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Namaste Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Namaste Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Namaste Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Namaste Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2005
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Namaste Solar

Send your project details to request follow-up from Namaste Solar. Response timing and consultation terms are set by the company.

For Namaste Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

Namaste Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.