M

MSI Solar in Bakersfield

Bakersfield, California·Solar Installation
Residential

17+ yrs

Experience

80 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About MSI Solar

Tesla Powerwall certified solar and security specialist serving Bakersfield and Kern County since 2009

Bakersfield, California 93313

Bakersfield, California 93313

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla Powerwall Certified InstallerCSLB #994536

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Bakersfield, CaliforniaDelano, CaliforniaShafter, CaliforniaWasco, CaliforniaTehachapi, California

Customer Reviews

No reviews yet. Be the first to review MSI Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from MSI Solar?

You can request a quote through the form on this page or contact MSI Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does MSI Solar serve?

MSI Solar is based in Bakersfield and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does MSI Solar hold?

This profile lists the following reported certifications: Tesla Powerwall Certified Installer, CSLB #994536. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does MSI Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask MSI Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask MSI Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does MSI Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask MSI Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2009
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from MSI Solar

Send your project details to request follow-up from MSI Solar. Response timing and consultation terms are set by the company.

For MSI Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
M

MSI Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.