M

Momentum Solar in Birmingham

Birmingham, Alabama·Solar Installation
Residential

17+ yrs

Experience

150 km

Service radius

201-500

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Momentum Solar

National residential solar installer with a dedicated Birmingham office and flexible financing options

Birmingham, Alabama 35242

Birmingham, Alabama 35242

Services Offered

Solar InstallationSolar DesignMonitoring

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Birmingham, AlabamaHoover, AlabamaVestavia Hills, AlabamaHomewood, AlabamaMountain Brook, AlabamaTrussville, AlabamaPelham, Alabama

Customer Reviews

No reviews yet. Be the first to review Momentum Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Momentum Solar?

You can request a quote through the form on this page or contact Momentum Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Momentum Solar serve?

Momentum Solar is based in Birmingham and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Momentum Solar hold?

This profile does not list independently verified certifications. Ask Momentum Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Momentum Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Momentum Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Momentum Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Momentum Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Momentum Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2009
Employees201-500
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Momentum Solar

Send your project details to request follow-up from Momentum Solar. Response timing and consultation terms are set by the company.

For Momentum Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
M

Momentum Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.