Mitten Solar Consultants in Grand Rapids
4+ yrs
Experience
80 km
Service radius
1-10
Employees
Profile information
About Mitten Solar Consultants
Local solar consulting and installation company serving the greater Grand Rapids area since 2022
Grand Rapids, Michigan 49341
Grand Rapids, Michigan 49341
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Mitten Solar Consultants!
Frequently Asked Questions
How do I get a quote from Mitten Solar Consultants?
You can request a quote through the form on this page or contact Mitten Solar Consultants directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Mitten Solar Consultants serve?
Mitten Solar Consultants is based in Grand Rapids and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Mitten Solar Consultants hold?
This profile lists the following reported certifications: BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Mitten Solar Consultants offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Mitten Solar Consultants for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Mitten Solar Consultants for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Mitten Solar Consultants handle permits and paperwork?
The exact scope is not verified on this profile. Ask Mitten Solar Consultants which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Mitten Solar Consultants
Send your project details to request follow-up from Mitten Solar Consultants. Response timing and consultation terms are set by the company.
For Mitten Solar Consultants
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Mitten Solar Consultants