M

Michigan Solar Solutions in Detroit

Detroit, Michigan·Solar Installation
ResidentialCommercialIndustrial

19+ yrs

Experience

2500+

Projects

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Michigan Solar Solutions

Michigan's trusted solar installer since 2007 with NABCEP-certified in-house crews and 2,500+ completed projects

Detroit, Michigan 48382

Detroit, Michigan 48382

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditMonitoringMaintenanceCommercial Solar

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB A+ Rating

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SolariaJinko SolarSolarWorld

Inverters

SolarEdgeEnphaseSMA

Batteries

Tesla PowerwallEnphaseSol-ArkOutback Power

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Detroit, MichiganCommerce Township, MichiganAnn Arbor, MichiganWixom, MichiganNovi, MichiganFarmington Hills, MichiganLansing, MichiganGrand Rapids, MichiganTraverse City, MichiganMidland, Michigan

Customer Reviews

No reviews yet. Be the first to review Michigan Solar Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Michigan Solar Solutions?

You can request a quote through the form on this page or contact Michigan Solar Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Michigan Solar Solutions serve?

Michigan Solar Solutions is based in Detroit and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Michigan Solar Solutions hold?

This profile lists the following reported certifications: NABCEP, BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Michigan Solar Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Michigan Solar Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Michigan Solar Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Michigan Solar Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Michigan Solar Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Michigan Solar Solutions

Send your project details to request follow-up from Michigan Solar Solutions. Response timing and consultation terms are set by the company.

For Michigan Solar Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
M

Michigan Solar Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.