M

MC Power Companies in Kansas City

Kansas City, Missouri·Solar Installation
CommercialResidential

16+ yrs

Experience

300 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About MC Power Companies

Kansas City solar and electrical contractor since 2010 with over 90 MW installed and seven consecutive Top Solar Contractor awards

Kansas City, Missouri 64086

Kansas City, Missouri 64086

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPSEIA MemberTop Solar Contractor (Solar Power World)

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Kansas City, MissouriLee's Summit, MissouriIndependence, MissouriOverland Park, MissouriSt. Louis, MissouriColumbia, Missouri

Customer Reviews

No reviews yet. Be the first to review MC Power Companies!

Write a Review

Frequently Asked Questions

How do I get a quote from MC Power Companies?

You can request a quote through the form on this page or contact MC Power Companies directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does MC Power Companies serve?

MC Power Companies is based in Kansas City and serves within a 300 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does MC Power Companies hold?

This profile lists the following reported certifications: NABCEP, SEIA Member, Top Solar Contractor (Solar Power World). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does MC Power Companies offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask MC Power Companies for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask MC Power Companies for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does MC Power Companies handle permits and paperwork?

The exact scope is not verified on this profile. Ask MC Power Companies which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2010
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from MC Power Companies

Send your project details to request follow-up from MC Power Companies. Response timing and consultation terms are set by the company.

For MC Power Companies

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
M

MC Power Companies

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.