M

Masterpiece Solar in Jacksonville

Jacksonville, Florida·Solar Installation
ResidentialCommercial

6+ yrs

Experience

100 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Masterpiece Solar

Published directory profile for Masterpiece Solar in Jacksonville. Verify services, credentials, ratings, and references directly with their original sources.

Jacksonville, Florida 32202

Jacksonville, Florida 32202

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditMaintenancesolar_panel_removal

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedSt. Johns County Chamber Member

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

QcellsCanadian Solar

Inverters

Enphase

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Jacksonville, FloridaSt. Augustine, FloridaJacksonville Beach, FloridaPonte Vedra Beach, FloridaOrange Park, FloridaFernandina Beach, Florida

Customer Reviews

No reviews yet. Be the first to review Masterpiece Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Masterpiece Solar?

You can request a quote through the form on this page or contact Masterpiece Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Masterpiece Solar serve?

Masterpiece Solar is based in Jacksonville and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Masterpiece Solar hold?

This profile lists the following reported certifications: BBB Accredited, St. Johns County Chamber Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Masterpiece Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Masterpiece Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Masterpiece Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Masterpiece Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Masterpiece Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Masterpiece Solar

Send your project details to request follow-up from Masterpiece Solar. Response timing and consultation terms are set by the company.

For Masterpiece Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
M

Masterpiece Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.