M

Magic Solar in Boise

Boise, Idaho·Solar Installation
ResidentialCommercial

6+ yrs

Experience

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Magic Solar

Idaho's trusted commercial and residential solar installer serving Boise and the Magic Valley with comprehensive design and installation services

Boise, Idaho 83709

Boise, Idaho 83709

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Licensed Idaho Contractor

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Tier-1 Solar Panels

Inverters

EnphaseSolarEdge

Batteries

Battery Storage

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Boise, IdahoTwin Falls, IdahoJerome, IdahoMeridian, IdahoNampa, IdahoEagle, IdahoCaldwell, Idaho

Customer Reviews

No reviews yet. Be the first to review Magic Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Magic Solar?

You can request a quote through the form on this page or contact Magic Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Magic Solar serve?

Magic Solar is based in Boise and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Magic Solar hold?

This profile lists the following reported certifications: Licensed Idaho Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Magic Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Magic Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Magic Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Magic Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Magic Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Magic Solar

Send your project details to request follow-up from Magic Solar. Response timing and consultation terms are set by the company.

For Magic Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
M

Magic Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.