M

MAD Energy NW in Tacoma

Tacoma, Washington·Solar Installation
ResidentialCommercial

6+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About MAD Energy NW

NABCEP-certified solar and electrical installer serving Tacoma and the greater Puget Sound since 2020

Tacoma, Washington 98092

Tacoma, Washington 98092

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedPSE AffiliateMaster Electrician

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Tacoma, WashingtonAuburn, WashingtonSeattle, WashingtonBellevue, WashingtonRenton, WashingtonKent, Washington

Customer Reviews

No reviews yet. Be the first to review MAD Energy NW!

Write a Review

Frequently Asked Questions

How do I get a quote from MAD Energy NW?

You can request a quote through the form on this page or contact MAD Energy NW directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does MAD Energy NW serve?

MAD Energy NW is based in Tacoma and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does MAD Energy NW hold?

This profile lists the following reported certifications: NABCEP Certified, PSE Affiliate, Master Electrician. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does MAD Energy NW offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask MAD Energy NW for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask MAD Energy NW for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does MAD Energy NW handle permits and paperwork?

The exact scope is not verified on this profile. Ask MAD Energy NW which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from MAD Energy NW

Send your project details to request follow-up from MAD Energy NW. Response timing and consultation terms are set by the company.

For MAD Energy NW

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
M

MAD Energy NW

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.