Lucent Energy in Savannah
1000+
Projects
120 km
Service radius
11-50
Employees
Profile information
About Lucent Energy
Direct solar installer in Savannah providing residential and commercial solar panels, battery storage, and Tesla Solar Roof with in-house crews
Savannah, Georgia 31405
Savannah, Georgia 31405
Services Offered
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Lucent Energy!
Frequently Asked Questions
How do I get a quote from Lucent Energy?
You can request a quote through the form on this page or contact Lucent Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Lucent Energy serve?
Lucent Energy is based in Savannah and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Lucent Energy hold?
This profile does not list independently verified certifications. Ask Lucent Energy for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Lucent Energy offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Lucent Energy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Lucent Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Lucent Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask Lucent Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Lucent Energy
Send your project details to request follow-up from Lucent Energy. Response timing and consultation terms are set by the company.
For Lucent Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Lucent Energy