L

LightWave Solar in Nashville

Nashville, Tennessee·Solar Installation
ResidentialCommercial

20+ yrs

Experience

350+

Projects

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About LightWave Solar

Tennessee's first full-time solar installer since 2006, with the most NABCEP-certified professionals in the state

Nashville, Tennessee 37013

Nashville, Tennessee 37013

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditMaintenanceMonitoringGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPTennessee Electrical Contractor #58005

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Canadian SolarQcells

Inverters

SolarEdgeEnphase

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Nashville, TennesseeChattanooga, TennesseeKnoxville, TennesseeFranklin, TennesseeMurfreesboro, TennesseeBrentwood, TennesseeClarksville, Tennessee

Customer Reviews

No reviews yet. Be the first to review LightWave Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from LightWave Solar?

You can request a quote through the form on this page or contact LightWave Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does LightWave Solar serve?

LightWave Solar is based in Nashville and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does LightWave Solar hold?

This profile lists the following reported certifications: NABCEP, Tennessee Electrical Contractor #58005. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does LightWave Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask LightWave Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask LightWave Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does LightWave Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask LightWave Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2006
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from LightWave Solar

Send your project details to request follow-up from LightWave Solar. Response timing and consultation terms are set by the company.

For LightWave Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
L

LightWave Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.