Lehmann Electrical & Design in Milwaukee
6+ yrs
Experience
350+
Projects
80 km
Service radius
11-50
Employees
Profile information
About Lehmann Electrical & Design
Published directory profile for Lehmann Electrical & Design in Milwaukee. Verify services, credentials, ratings, and references directly with their original sources.
Milwaukee, Wisconsin 53226
Milwaukee, Wisconsin 53226
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Lehmann Electrical & Design!
Frequently Asked Questions
How do I get a quote from Lehmann Electrical & Design?
You can request a quote through the form on this page or contact Lehmann Electrical & Design directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Lehmann Electrical & Design serve?
Lehmann Electrical & Design is based in Milwaukee and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Lehmann Electrical & Design hold?
This profile lists the following reported certifications: Wisconsin Master Electrician, Tesla Certified EV Installer, BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Lehmann Electrical & Design offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Lehmann Electrical & Design for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Lehmann Electrical & Design for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Lehmann Electrical & Design handle permits and paperwork?
The exact scope is not verified on this profile. Ask Lehmann Electrical & Design which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Lehmann Electrical & Design
Send your project details to request follow-up from Lehmann Electrical & Design. Response timing and consultation terms are set by the company.
For Lehmann Electrical & Design
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Lehmann Electrical & Design