K

KW Solar in Houston

Houston, Texas·Solar Installation
ResidentialCommercial

11+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About KW Solar

Houston-born solar installer since 2015 serving residential and commercial customers across the Gulf Coast

Houston, Texas 77032

Houston, Texas 77032

Services Offered

Solar InstallationBattery Storage

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

REC

Inverters

EnphaseTesla

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Houston, TexasKaty, TexasSugar Land, TexasPearland, TexasLeague City, TexasGalveston, Texas

Customer Reviews

No reviews yet. Be the first to review KW Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from KW Solar?

You can request a quote through the form on this page or contact KW Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does KW Solar serve?

KW Solar is based in Houston and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does KW Solar hold?

This profile does not list independently verified certifications. Ask KW Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does KW Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask KW Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask KW Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does KW Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask KW Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from KW Solar

Send your project details to request follow-up from KW Solar. Response timing and consultation terms are set by the company.

For KW Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.