Kostoff Construction in Cincinnati
8+ yrs
Experience
80 km
Service radius
1-10
Employees
Profile information
About Kostoff Construction
Full-service construction company offering solar panel installation in Greater Cincinnati
Cincinnati, Ohio 45014
Cincinnati, Ohio 45014
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Kostoff Construction!
Frequently Asked Questions
How do I get a quote from Kostoff Construction?
You can request a quote through the form on this page or contact Kostoff Construction directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Kostoff Construction serve?
Kostoff Construction is based in Cincinnati and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Kostoff Construction hold?
This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Kostoff Construction offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Kostoff Construction for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Kostoff Construction for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Kostoff Construction handle permits and paperwork?
The exact scope is not verified on this profile. Ask Kostoff Construction which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Kostoff Construction
Send your project details to request follow-up from Kostoff Construction. Response timing and consultation terms are set by the company.
For Kostoff Construction
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Kostoff Construction