K

Kokosing Solar in Columbus

Columbus, Ohio·Solar Installation
ResidentialCommercial

26+ yrs

Experience

3000+

Projects

200 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Kokosing Solar

Ohio's longest-operating solar installer since 2000, backed by the 71-year legacy of Kokosing Inc construction

Columbus, Ohio 43081

Columbus, Ohio 43081

Services Offered

Solar InstallationBattery StorageEV ChargingSolar DesignMaintenanceMonitoringCommercial Solar

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPAuthorized SunPower DealerBBB A+ Rating

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

17yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Columbus, OhioWesterville, OhioCleveland, OhioCincinnati, OhioAthens, OhioDublin, OhioDayton, OhioAkron, Ohio

Customer Reviews

No reviews yet. Be the first to review Kokosing Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Kokosing Solar?

You can request a quote through the form on this page or contact Kokosing Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Kokosing Solar serve?

Kokosing Solar is based in Columbus and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Kokosing Solar hold?

This profile lists the following reported certifications: NABCEP, Authorized SunPower Dealer, BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Kokosing Solar offer?

This profile reports 25-year panel coverage and 17-year workmanship coverage. Ask Kokosing Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Kokosing Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Kokosing Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Kokosing Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2000
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Kokosing Solar

Send your project details to request follow-up from Kokosing Solar. Response timing and consultation terms are set by the company.

For Kokosing Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
K

Kokosing Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.