K

Kilo Hollow Energy in Richmond

Richmond, Virginia·Solar Installation
ResidentialCommercial

6+ yrs

Experience

120 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Kilo Hollow Energy

Richmond-headquartered solar installer offering residential and commercial systems with backup power, ground mounts, and carport solutions

Richmond, Virginia 23233

Richmond, Virginia 23233

Services Offered

Solar InstallationSolar DesignBattery Storageground_mountMaintenanceGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedLicensed Contractor (VA)

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Richmond, VirginiaHenrico, VirginiaGlen Allen, VirginiaChesterfield, VirginiaMidlothian, VirginiaShort Pump, Virginia

Customer Reviews

No reviews yet. Be the first to review Kilo Hollow Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Kilo Hollow Energy?

You can request a quote through the form on this page or contact Kilo Hollow Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Kilo Hollow Energy serve?

Kilo Hollow Energy is based in Richmond and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Kilo Hollow Energy hold?

This profile lists the following reported certifications: BBB Accredited, Licensed Contractor (VA). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Kilo Hollow Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Kilo Hollow Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Kilo Hollow Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Kilo Hollow Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Kilo Hollow Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Kilo Hollow Energy

Send your project details to request follow-up from Kilo Hollow Energy. Response timing and consultation terms are set by the company.

For Kilo Hollow Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
K

Kilo Hollow Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.