Joule Energy in New Orleans
16+ yrs
Experience
1500+
Projects
200 km
Service radius
51-200
Employees
Profile information
About Joule Energy
Certified B Corporation and NABCEP-certified solar installer in New Orleans with 1,500+ completed projects since 2010
New Orleans, Louisiana 70119
New Orleans, Louisiana 70119
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Joule Energy!
Frequently Asked Questions
How do I get a quote from Joule Energy?
You can request a quote through the form on this page or contact Joule Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Joule Energy serve?
Joule Energy is based in New Orleans and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Joule Energy hold?
This profile lists the following reported certifications: NABCEP, Certified B Corporation. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Joule Energy offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Joule Energy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Joule Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Joule Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask Joule Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Joule Energy
Send your project details to request follow-up from Joule Energy. Response timing and consultation terms are set by the company.
For Joule Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Joule Energy