JK Renewables in Birmingham
10+ yrs
Experience
200 km
Service radius
51-200
Employees
Profile information
About JK Renewables
National commercial and residential solar installer with a Birmingham office offering 25-year system warranties
Birmingham, Alabama 35203
Birmingham, Alabama 35203
Services Offered
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review JK Renewables!
Frequently Asked Questions
How do I get a quote from JK Renewables?
You can request a quote through the form on this page or contact JK Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does JK Renewables serve?
JK Renewables is based in Birmingham and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does JK Renewables hold?
This profile does not list independently verified certifications. Ask JK Renewables for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does JK Renewables offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask JK Renewables for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask JK Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does JK Renewables handle permits and paperwork?
The exact scope is not verified on this profile. Ask JK Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from JK Renewables
Send your project details to request follow-up from JK Renewables. Response timing and consultation terms are set by the company.
For JK Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
JK Renewables