J

JCO Solar in Baton Rouge

Baton Rouge, Louisiana·Solar Installation
ResidentialCommercial

5+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About JCO Solar

Locally owned Louisiana solar contractor specializing in residential and commercial solar with battery backup

Baton Rouge, Louisiana 70726

Baton Rouge, Louisiana 70726

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Louisiana Licensed Contractor (72777)Sol-Ark Certified InstallerLion Energy Certified InstallerIronRidge Certified InstallerStorz Power Certified InstallerLumin Certified InstallerNABCEP Certified (Lion Energy)

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

Sol-Ark

Batteries

Lion EnergyStorz Power

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Baton Rouge, LouisianaDenham Springs, LouisianaGonzales, LouisianaPrairieville, LouisianaWalker, LouisianaHammond, Louisiana

Customer Reviews

No reviews yet. Be the first to review JCO Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from JCO Solar?

You can request a quote through the form on this page or contact JCO Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does JCO Solar serve?

JCO Solar is based in Baton Rouge and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does JCO Solar hold?

This profile lists the following reported certifications: Louisiana Licensed Contractor (72777), Sol-Ark Certified Installer, Lion Energy Certified Installer, IronRidge Certified Installer, Storz Power Certified Installer, Lumin Certified Installer, NABCEP Certified (Lion Energy). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does JCO Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask JCO Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask JCO Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does JCO Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask JCO Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2021
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from JCO Solar

Send your project details to request follow-up from JCO Solar. Response timing and consultation terms are set by the company.

For JCO Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
J

JCO Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.