J

J-Tech Construction & Solar in Omaha

Omaha, Nebraska·Solar Installation
ResidentialCommercial

22+ yrs

Experience

120 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About J-Tech Construction & Solar

BBB-accredited Omaha solar and construction company with over 20 years in business

Omaha, Nebraska 68144

Omaha, Nebraska 68144

Services Offered

Solar Installation

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited (since 2010)

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Omaha, NebraskaLincoln, NebraskaGrand Island, NebraskaPapillion, NebraskaBellevue, NebraskaLa Vista, Nebraska

Customer Reviews

No reviews yet. Be the first to review J-Tech Construction & Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from J-Tech Construction & Solar?

You can request a quote through the form on this page or contact J-Tech Construction & Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does J-Tech Construction & Solar serve?

J-Tech Construction & Solar is based in Omaha and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does J-Tech Construction & Solar hold?

This profile lists the following reported certifications: BBB Accredited (since 2010). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does J-Tech Construction & Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask J-Tech Construction & Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask J-Tech Construction & Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does J-Tech Construction & Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask J-Tech Construction & Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2004
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from J-Tech Construction & Solar

Send your project details to request follow-up from J-Tech Construction & Solar. Response timing and consultation terms are set by the company.

For J-Tech Construction & Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
J

J-Tech Construction & Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.