I

Island Pacific Energy in Honolulu

Honolulu, Hawaii·Solar Installation
ResidentialCommercial

19+ yrs

Experience

60 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Island Pacific Energy

Locally owned Honolulu solar company providing personalized solar and battery solutions since 2007

Honolulu, Hawaii 96813

Honolulu, Hawaii 96813

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid Connection

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECHanwha Q Cells

Inverters

SolarEdgeEnphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Honolulu, HawaiiKailua, HawaiiKaneohe, HawaiiPearl City, HawaiiAiea, HawaiiHawaii Kai, HawaiiKapolei, Hawaii

Customer Reviews

No reviews yet. Be the first to review Island Pacific Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Island Pacific Energy?

You can request a quote through the form on this page or contact Island Pacific Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Island Pacific Energy serve?

Island Pacific Energy is based in Honolulu and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Island Pacific Energy hold?

This profile does not list independently verified certifications. Ask Island Pacific Energy for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Island Pacific Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Island Pacific Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Island Pacific Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Island Pacific Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Island Pacific Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Island Pacific Energy

Send your project details to request follow-up from Island Pacific Energy. Response timing and consultation terms are set by the company.

For Island Pacific Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Island Pacific Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.