I

Ipsun Solar in Washington

Washington, District of Columbia·Solar Installation
ResidentialCommercial

14+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Ipsun Solar

Leading DC-area solar installer offering $0-down lease options and comprehensive residential installations

Washington, District of Columbia 20036

Washington, District of Columbia 20036

Services Offered

Solar InstallationSolar DesignMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

DC Green Bank PartnerMontgomery County Green Bank Partner

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Washington, District of ColumbiaArlington, District of ColumbiaAlexandria, District of ColumbiaBethesda, District of ColumbiaSilver Spring, District of ColumbiaFairfax, District of ColumbiaRockville, District of Columbia

Customer Reviews

No reviews yet. Be the first to review Ipsun Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Ipsun Solar?

You can request a quote through the form on this page or contact Ipsun Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Ipsun Solar serve?

Ipsun Solar is based in Washington and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Ipsun Solar hold?

This profile lists the following reported certifications: DC Green Bank Partner, Montgomery County Green Bank Partner. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Ipsun Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Ipsun Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Ipsun Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Ipsun Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Ipsun Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2012
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Ipsun Solar

Send your project details to request follow-up from Ipsun Solar. Response timing and consultation terms are set by the company.

For Ipsun Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Ipsun Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.