Inty Power in Scottsdale
10+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Inty Power
Published directory profile for Inty Power in Scottsdale. Verify services, credentials, ratings, and references directly with their original sources.
Scottsdale, Arizona 85284
Scottsdale, Arizona 85284
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Inty Power!
Frequently Asked Questions
How do I get a quote from Inty Power?
You can request a quote through the form on this page or contact Inty Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Inty Power serve?
Inty Power is based in Scottsdale and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Inty Power hold?
This profile lists the following reported certifications: BBB Accredited, Tesla Powerwall Authorized Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Inty Power offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Inty Power for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Inty Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Inty Power handle permits and paperwork?
The exact scope is not verified on this profile. Ask Inty Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Inty Power
Send your project details to request follow-up from Inty Power. Response timing and consultation terms are set by the company.
For Inty Power
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Inty Power