I

Inter Faith Electric & Solar in Bakersfield

Bakersfield, California·Solar Installation
ResidentialCommercial
0

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Inter Faith Electric & Solar

Locally owned Bakersfield electrical and solar contractor with over 30 years of experience

Bakersfield, California 93301

Bakersfield, California 93301

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Bakersfield, CaliforniaDelano, CaliforniaShafter, CaliforniaWasco, CaliforniaTehachapi, California

Customer Reviews

No reviews yet. Be the first to review Inter Faith Electric & Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Inter Faith Electric & Solar?

You can request a quote through the form on this page or contact Inter Faith Electric & Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Inter Faith Electric & Solar serve?

Inter Faith Electric & Solar is based in Bakersfield and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Inter Faith Electric & Solar hold?

This profile does not list independently verified certifications. Ask Inter Faith Electric & Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Inter Faith Electric & Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Inter Faith Electric & Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Inter Faith Electric & Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Inter Faith Electric & Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Inter Faith Electric & Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

0
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Inter Faith Electric & Solar

Send your project details to request follow-up from Inter Faith Electric & Solar. Response timing and consultation terms are set by the company.

For Inter Faith Electric & Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Inter Faith Electric & Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.