I

Intelligent Design Air Conditioning, Plumbing, Solar, & Electric in Tucson

Tucson, Arizona·Solar Installation
ResidentialCommercial

47+ yrs

Experience

80 km

Service radius

51-100

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Intelligent Design Air Conditioning, Plumbing, Solar, & Electric

Family- and veteran-owned Tucson company offering solar alongside HVAC, plumbing, and electrical since 1979

Tucson, Arizona 85719

Tucson, Arizona 85719

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceMonitoringEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A+ AccreditedROC Licensed

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Tucson, ArizonaOro Valley, ArizonaMarana, ArizonaSahuarita, ArizonaGreen Valley, ArizonaVail, ArizonaCatalina, Arizona

Customer Reviews

No reviews yet. Be the first to review Intelligent Design Air Conditioning, Plumbing, Solar, & Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Intelligent Design Air Conditioning, Plumbing, Solar, & Electric?

You can request a quote through the form on this page or contact Intelligent Design Air Conditioning, Plumbing, Solar, & Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Intelligent Design Air Conditioning, Plumbing, Solar, & Electric serve?

Intelligent Design Air Conditioning, Plumbing, Solar, & Electric is based in Tucson and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Intelligent Design Air Conditioning, Plumbing, Solar, & Electric hold?

This profile lists the following reported certifications: BBB A+ Accredited, ROC Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Intelligent Design Air Conditioning, Plumbing, Solar, & Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Intelligent Design Air Conditioning, Plumbing, Solar, & Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Intelligent Design Air Conditioning, Plumbing, Solar, & Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Intelligent Design Air Conditioning, Plumbing, Solar, & Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Intelligent Design Air Conditioning, Plumbing, Solar, & Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1979
Employees51-100
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Intelligent Design Air Conditioning, Plumbing, Solar, & Electric

Send your project details to request follow-up from Intelligent Design Air Conditioning, Plumbing, Solar, & Electric. Response timing and consultation terms are set by the company.

For Intelligent Design Air Conditioning, Plumbing, Solar, & Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Intelligent Design Air Conditioning, Plumbing, Solar, & Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.