The Integrity Energy Group in Birmingham
6+ yrs
Experience
300 km
Service radius
2-10
Employees
Profile information
About The Integrity Energy Group
Multi-certified Alabama solar installer with 30,000 hours of design and installation experience serving statewide
Birmingham, Alabama 36542
Birmingham, Alabama 36542
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
5yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review The Integrity Energy Group!
Frequently Asked Questions
How do I get a quote from The Integrity Energy Group?
You can request a quote through the form on this page or contact The Integrity Energy Group directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does The Integrity Energy Group serve?
The Integrity Energy Group is based in Birmingham and serves within a 300 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does The Integrity Energy Group hold?
This profile lists the following reported certifications: Enphase Silver Certified, Tesla Certified, SolarEdge Certified, Sol-Ark Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does The Integrity Energy Group offer?
This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask The Integrity Energy Group for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask The Integrity Energy Group for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does The Integrity Energy Group handle permits and paperwork?
The exact scope is not verified on this profile. Ask The Integrity Energy Group which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from The Integrity Energy Group
Send your project details to request follow-up from The Integrity Energy Group. Response timing and consultation terms are set by the company.
For The Integrity Energy Group
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
The Integrity Energy Group