IntegrateSun in Denver
16+ yrs
Experience
7000+
Projects
120 km
Service radius
51-200
Employees
Profile information
About IntegrateSun
Multi-state solar installer with 37 years of experience and 7,000+ completed projects across 12 states
Denver, Colorado 80203
Denver, Colorado 80203
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review IntegrateSun!
Frequently Asked Questions
How do I get a quote from IntegrateSun?
You can request a quote through the form on this page or contact IntegrateSun directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does IntegrateSun serve?
IntegrateSun is based in Denver and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does IntegrateSun hold?
This profile lists the following reported certifications: NABCEP, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does IntegrateSun offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask IntegrateSun for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask IntegrateSun for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does IntegrateSun handle permits and paperwork?
The exact scope is not verified on this profile. Ask IntegrateSun which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from IntegrateSun
Send your project details to request follow-up from IntegrateSun. Response timing and consultation terms are set by the company.
For IntegrateSun
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
IntegrateSun