I

Integrated Building Systems in Milwaukee

Milwaukee, Wisconsin·Solar Installation
ResidentialCommercial

17+ yrs

Experience

300+

Projects

60 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Integrated Building Systems

Milwaukee master electrician and solar installer with 20+ years of electrical and renewable energy experience

Milwaukee, Wisconsin 53224

Milwaukee, Wisconsin 53224

Services Offered

Solar InstallationSolar Designelectrical_servicesMonitoringcogenerationaudio_video

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Milwaukee, WisconsinWauwatosa, WisconsinBrown Deer, WisconsinGlendale, WisconsinMenomonee Falls, WisconsinGermantown, WisconsinMequon, WisconsinWest Allis, WisconsinBrookfield, WisconsinHubertus, Wisconsin

Customer Reviews

No reviews yet. Be the first to review Integrated Building Systems!

Write a Review

Frequently Asked Questions

How do I get a quote from Integrated Building Systems?

You can request a quote through the form on this page or contact Integrated Building Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Integrated Building Systems serve?

Integrated Building Systems is based in Milwaukee and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Integrated Building Systems hold?

This profile does not list independently verified certifications. Ask Integrated Building Systems for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Integrated Building Systems offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Integrated Building Systems for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Integrated Building Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Integrated Building Systems handle permits and paperwork?

The exact scope is not verified on this profile. Ask Integrated Building Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2009
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Integrated Building Systems

Send your project details to request follow-up from Integrated Building Systems. Response timing and consultation terms are set by the company.

For Integrated Building Systems

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Integrated Building Systems

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.