I

Infinium Solar Roofing and Electric in San Jose

San Jose, California·Solar Installation
Residential

18+ yrs

Experience

60 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Infinium Solar Roofing and Electric

SunPower Certified Dealer serving the San Jose area since 2008, with 101+ reviews and 17 years of solar industry experience

San Jose, California 95008

San Jose, California 95008

Services Offered

Solar InstallationBattery StorageSolar DesignRoof AssessmentMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower Certified DealerCSLB Licensed

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

SunPowerEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

San Jose, CaliforniaCampbell, CaliforniaLos Gatos, CaliforniaSaratoga, CaliforniaSanta Clara, CaliforniaSunnyvale, CaliforniaCupertino, CaliforniaMountain View, California

Customer Reviews

No reviews yet. Be the first to review Infinium Solar Roofing and Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Infinium Solar Roofing and Electric?

You can request a quote through the form on this page or contact Infinium Solar Roofing and Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Infinium Solar Roofing and Electric serve?

Infinium Solar Roofing and Electric is based in San Jose and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Infinium Solar Roofing and Electric hold?

This profile lists the following reported certifications: SunPower Certified Dealer, CSLB Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Infinium Solar Roofing and Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Infinium Solar Roofing and Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Infinium Solar Roofing and Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Infinium Solar Roofing and Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Infinium Solar Roofing and Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Infinium Solar Roofing and Electric

Send your project details to request follow-up from Infinium Solar Roofing and Electric. Response timing and consultation terms are set by the company.

For Infinium Solar Roofing and Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Infinium Solar Roofing and Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.