I

Infinity Energy in Hartford

Hartford, Connecticut·Solar Installation
Residential

18+ yrs

Experience

10000+

Projects

120 km

Service radius

51-200

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Infinity Energy

Named Installer of the Year 2025 and 2026 with over 10,000 solar projects across the Northeast

Hartford, Connecticut 06037

Hartford, Connecticut 06037

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

EnergySage Installer of the Year 2025EnergySage Installer of the Year 2026Elite+ Installer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

QcellsREC

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Hartford, ConnecticutWest Hartford, ConnecticutNew Haven, ConnecticutWaterbury, ConnecticutBerlin, ConnecticutMiddletown, ConnecticutFarmington, ConnecticutBristol, Connecticut

Customer Reviews

No reviews yet. Be the first to review Infinity Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Infinity Energy?

You can request a quote through the form on this page or contact Infinity Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Infinity Energy serve?

Infinity Energy is based in Hartford and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Infinity Energy hold?

This profile lists the following reported certifications: EnergySage Installer of the Year 2025, EnergySage Installer of the Year 2026, Elite+ Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Infinity Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Infinity Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Infinity Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Infinity Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Infinity Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2008
Employees51-200
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Infinity Energy

Send your project details to request follow-up from Infinity Energy. Response timing and consultation terms are set by the company.

For Infinity Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Infinity Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.