I

Independent Power Generation in Spokane

Spokane, Washington·Solar Installation
ResidentialCommercial

5+ yrs

Experience

150 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Independent Power Generation

NABCEP-certified solar and renewable energy contractor serving Eastern Washington and North Idaho since 2021

Spokane, Washington 99205

Spokane, Washington 99205

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPTesla Certified InstallerEGSA Member

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Tesla

Inverters

Enphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Spokane, WashingtonSpokane Valley, WashingtonLiberty Lake, WashingtonCoeur d'Alene, WashingtonAirway Heights, WashingtonCheney, WashingtonDeer Park, Washington

Customer Reviews

No reviews yet. Be the first to review Independent Power Generation!

Write a Review

Frequently Asked Questions

How do I get a quote from Independent Power Generation?

You can request a quote through the form on this page or contact Independent Power Generation directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Independent Power Generation serve?

Independent Power Generation is based in Spokane and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Independent Power Generation hold?

This profile lists the following reported certifications: NABCEP, Tesla Certified Installer, EGSA Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Independent Power Generation offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Independent Power Generation for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Independent Power Generation for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Independent Power Generation handle permits and paperwork?

The exact scope is not verified on this profile. Ask Independent Power Generation which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded2021
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Independent Power Generation

Send your project details to request follow-up from Independent Power Generation. Response timing and consultation terms are set by the company.

For Independent Power Generation

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Independent Power Generation

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.