I

Independent Power Systems in Aurora

Aurora, Colorado·Solar Installation
ResidentialCommercial

30+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Independent Power Systems

Boulder-based solar pioneer since 1996 offering solar, battery storage, EV chargers, and heat pumps across Colorado

Aurora, Colorado 80301

Aurora, Colorado 80301

Services Offered

Solar InstallationBattery StorageEV ChargingSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Aurora, ColoradoBoulder, ColoradoDenver, ColoradoLongmont, ColoradoFort Collins, ColoradoBroomfield, Colorado

Customer Reviews

No reviews yet. Be the first to review Independent Power Systems!

Write a Review

Frequently Asked Questions

How do I get a quote from Independent Power Systems?

You can request a quote through the form on this page or contact Independent Power Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Independent Power Systems serve?

Independent Power Systems is based in Aurora and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Independent Power Systems hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Independent Power Systems offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Independent Power Systems for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Independent Power Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Independent Power Systems handle permits and paperwork?

The exact scope is not verified on this profile. Ask Independent Power Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1996
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Independent Power Systems

Send your project details to request follow-up from Independent Power Systems. Response timing and consultation terms are set by the company.

For Independent Power Systems

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Independent Power Systems

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.