Imagine Energy in Portland
22+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Imagine Energy
Full-service Portland solar contractor with over two decades of residential and commercial experience
Portland, Oregon 97227
Portland, Oregon 97227
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Imagine Energy!
Frequently Asked Questions
How do I get a quote from Imagine Energy?
You can request a quote through the form on this page or contact Imagine Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Imagine Energy serve?
Imagine Energy is based in Portland and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Imagine Energy hold?
This profile does not list independently verified certifications. Ask Imagine Energy for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Imagine Energy offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Imagine Energy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Imagine Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Imagine Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask Imagine Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Imagine Energy
Send your project details to request follow-up from Imagine Energy. Response timing and consultation terms are set by the company.
For Imagine Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Imagine Energy