IES Texas Solar in Fort Worth
7+ yrs
Experience
100 km
Service radius
51-200
Employees
Profile information
About IES Texas Solar
Full-service solar installer backed by IES Holdings, serving Texas since 2019
Fort Worth, Texas 75088
Fort Worth, Texas 75088
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review IES Texas Solar!
Frequently Asked Questions
How do I get a quote from IES Texas Solar?
You can request a quote through the form on this page or contact IES Texas Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does IES Texas Solar serve?
IES Texas Solar is based in Fort Worth and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does IES Texas Solar hold?
This profile does not list independently verified certifications. Ask IES Texas Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does IES Texas Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask IES Texas Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask IES Texas Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does IES Texas Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask IES Texas Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from IES Texas Solar
Send your project details to request follow-up from IES Texas Solar. Response timing and consultation terms are set by the company.
For IES Texas Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
IES Texas Solar